top of page

PROJECTS INCLUDE :-

Rotherham General Hospital

1.2MW Combined Heat & Power (CHP) & 0.5MW Battery Energy Storage System (BESS) Site Integration, Design and Commissioning Project.

Queen Elizabeth, The Queen Mother Hospital (QEQM), Margate

1.2MW Combined Heat & Power (CHP) & 0.4MW Solar PV Panels Site Integration, Design and Commissioning Project.

EuroAPI, Haverhill

Integration of new 1.5MW Solar PV installation into existing site. undertake site fault level & protection study, undertake P28, P29 & G5 studies, completion of G99 compliance report and injection testing/demonstrations of compliance to UKPN.

 

Supply, Install & Commission new Power Management System to interface and co-ordinate new PV, Existing CHP and incoming 11kV mains supply controls for efficient power and heat generation/utilization.

Muller Foods, Bridgewater

Modelling of new 2MW 11kV Generator installation to provide DNO  compliance report for P28 (Voltage Fluctuation & Flicker), P29 (Voltage Imbalance) and G5 (Harmonics).

Nursling BESS, Nursling

Design of new 50MW Battery Energy Storage System (BESS) Site including 132kV switchyard, 33kV substation, iDNO and DNO integration

John Radcliffe Hospital

bottom of page